GNN Ads
The power supply to affected parts of Sindh and Balochistan have also resumed following the removal of technical faults.
Earlier, KESCO sources said that power supply to Jafferabad and Nasirabad among various areas was halted as a technical fault had occurred in Dera Murad Jamali grid station.
On the other hand, as soon as two units of Guddu thermal tripped on Friday night, twelve more units also got off after which power supply to various areas of Sindh and Balochistan were suspended.
Later on Saturday morning, the technical faults were fixed after which the power supply to the affected areas resumed. (Geo) (GNN)